The worlds first non-metallic trench lining system for the safe installation of utilities.
Easy to transport and assemble, the heaviest component weighs only 25kg, making EZE-Shoring the ideal composite trench lining solution.
Manufactured by Exel Composites UK, this high-performance composite system comprises of only 5 different components. The lightweight, easy to assemble system uses composite struts (where necessary) to make it 100% non-conductive.
This makes it the safest, easiest and lightest trench lining product available for the installation of underground utilities, - gas, water and electricity (Steel struts can also be utilised in the system as an alternative option if conductivity is not a critical factor)